Stash Update 10/28/12

Finally, something to report.

The Fig Tree top is with my quilter for 6.75 yards out.  I bought the backing from her and will adjust for all that when I get the top back.  The rug sample used another .25 yards.  No fabric in this week.

I have another quilt to the binding stage, but I’ll wait and count that out once it’s finished next week.

 

To see how much fabric everyone else is using, visit Patchwork Times.

Fabric Added:  23 yards

Fabric Used:    18 1/4 yards

Net Added:      4 3/4 yards

Advertisements
This entry was posted in charityquilts, scrapquilts, stashbusting and tagged , . Bookmark the permalink.

2 Responses to Stash Update 10/28/12

  1. Dee Dee says:

    Looking forward to see how your Fig Tree quilt finished. The quilt you are binding is a bright and cheery quilt. Thanks for sharing.

  2. Not a bad year, you are not very far into the black.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s