Sunday Stash July 28, 2019

No change in the numbers this week.
I’m half way through quilting the 30s quilt, maybe a little more. The stems are sewn down on the acorn runner. I pulled the back, batting and binding fabric together for it.
Last night I cleaned up and stacked everything on the bed in order with the runner on top.
project lineupLeft to right, possible choices for the 30s binding, the acorn runner with backing, batting and binding, the 9 patch top with backing and binding, and the project box for the next UFO. Looks like a sewing plan for the next few months.
The line-up contains a lot of finishes, which will greatly improve the numbers.
Fabric Added: 50.25
Fabric Used: 4.25 yards
Net Fabric In: 46 yards
How did you do this week?

1 Julie in GA
2 Chrisknits
3 Meloney
4 Quilting Gail
5 Angie in SoCal
6 Melva Loves Scraps

Advertisement
This entry was posted in charityquilts, scrapquilts, The Short List, ufos and tagged , , , . Bookmark the permalink.

5 Responses to Sunday Stash July 28, 2019

  1. Laura says:

    You are very organized! I look forward to seeing the finishes soon! 🙂

  2. Kate says:

    Good luck with your stitching plans. Hopefully that will be 3 more UFOs off the list.

  3. Pingback: Unboxing Video | Quilting Gail

  4. Gayle Kush says:

    Good job! I did pretty good. Gothe baby quilt for a shower this coming up Sunday all qilted and all ready for the hand sewing part of the binding. Should make that Sunday deadline! Not as busy as you are though.

  5. Joyce Crabtree says:

    The runner came out well. Nice work Donna!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s